As the health and safety of our residents is of paramount importance, the City of West Covina has closed City Hall to the public and suspended all City-sponsored events until further notice.  In addition, several City facilities have been temporary closed.  Please note the City Hall has been reopened to the public.  For more information please visit the City’s webpage: Coronavirus (COVID-19)

 

Cameron 56

Print
Press Enter to show all options, press Tab go to next option


Project Description

 

Cameron 56 is a 56-unit energy-efficient townhome development by Meritage Homes Corporation. The project is being developed within the Downtown District, the first multi-family residential project to be developed since the Downtown Plan and Code was adopted in 2016. A 13,329 square foot single-story professional office building was demolished to make way for the 56-unit townhomes. This project also includes the sale of a two vacant City-owned parcels (totaling 2,700 square feet).

The townhomes will have a modern architectural design, that will include features such as steel rod-supported metal awnings decorative metal garage doors, and much more. The project consists of two to four-bedroom units ranging among six different floor plans (1,353 to 2,023 square feet). Each townhome will feature a 411 - 446 square feet attached two-car garage.

The project is anticipated to take one and a half year to complete.

For additional information about Cameron 56 and Meritage Homes LLC including information about purchasing a townhome, please visit their website at https://www.meritagehomes.com/state/ca/southern-ca/cameron-56

For more information about the Cameron 56 Townhomes, please read the following:

Site

  • Location - 1530 W. Cameron Avenue
  • Land - 2.82 Acres
    • Plan 1 – 8 Units – 1,353 SF plus 446 SF attached 2-car garage
    • Plan 2 – 6 Units – 1,375 SF plus 442 SF attached 2-car garage
    • Plan 3 – 14 Units – 1,649 SF plus 415 SF attached 2-car garage
    • Plan 4 – 18 Units – 1,868 SF plus 415 SF attached 2-car garage
    • Plan 5 – 2 Units – 2,023 SF plus 411 SF attached 2-car garage
    • Plan 6 – 8 Units – 1,660 SF plus 411 SF attached 2-car garage

 Timeline

  • March 2019 – Demolition of Building
  • August/September 2019 – Start of Construction
  • January to March 2020 – First Phase (Model 1) to be Complete
  • April to June 2020 – Second Phase (Model 2) to be Complete
  • December of 2020 – Completion of Entire Project

Renderings

Cameron 56

 

Southwest Elevation

Cameron 56

Southwest Elevation

Please see below for project progress:


Cameron 56's Project Status

Updated on 12/03/2019 3:26 PM